خلاصہ

Cost Saving Projects

Minimize maintenance cost per DP (saved US$ 38,760).
Procurement (saved US$ 46,748).
Inventory.(Slow and Dead) (Sold Sister Company & Used alternate) (saved US$ 62,145).
100 Machines per Technician. (saved US$ 26,040).
Horizontal lines in crotches New Machines. (saved US$ 7,098.0).
TOTAL SAVED COST. US$ 180,791.0



Initiatives

Fastest operation of 60 New Shima Machines.
Shima Machine Bad size Conversion To Utilize idle machines
Develop Elastic Yarn device (to reduce cuff variation)
Develop Wooden cropping Bin.
Arrange LED light in Shima machine.
Reduce Oil consumption (Recycle).

Production Increase Projects

Reduced Downtime 51% Compare to 2017. (Production increased 78,310Dp)
Removed Dropping Failure. (Production increased 22,995Dp)
Increasing productivity of knitting (15G & 18G) by increase in machine RPM.
(Production increased 84,000Dp)
To Utilize idle machines and to increase productivity. (Production increased 17,450Dp)
Reduced Downtime and machines condition improved. (Stitching Department)
Reduce liner rejection.
Resolve crotch line problem in 15G SFG-I machine.
TOTAL PRODUCTION INCREASE 202,755Dp


Layouts

New Shima Machine layout on three floors.
New building floor layout (Four Floors)

پراجیکٹس

Projects-2018

تجربہ

کمپنی کا لوگو
Assistant Manager ( Maintenance & Production )
Prime Safety Limited (Midas Safety)
اگست ۲۰۰۵ - موجودہ | Karachi, Pakistan

تعلیم

Indus Institute of Higher Education
بیچلرز, بیچلرز ان ٹیکنالوجی, B.Tech (Mechanical)‎
Mechanics
CGPA 3.5/4
2010

آپ کن کمپنیز کی پیروی کر رہے ہیں